Case Study

In order to validate the risk assessment results and methodology, the project selected one of the high risk areas identified as a case study. For this specific case study area, data was analysed using an existing methodology to benchmark the results of the project. The high risk area was identified after the conclusion of the risk assessment.

Key Task Deliverables:

  • Case study report